Description:
For the residents of Ulice bratov Uèakar we managed the project of renovating the flat roof by helping with the call for application documentation, the selection of the building contractor and by supervising.
The construction work was done by Montim d.o.o. and now has a positive reference for us. The whole roofing system is made on the instructions from Bauder with bitumen plates.
Roof renovation - Ulica bratov Uèakar
Size: 650 m2
Floor: 
Building period: 2 months
Year of build: 2013
Work-typ: Supervision
Investor: Stanovalci UBU

 
 
 
 
 
Description:
Right beneath the castle Podèetrtek we managed and supervised the project of constructing touristic apartments Ortenia, which are built with a low energy standard, with a low carbon footprint, ecologically oriented and Sustainability of Construction. The project was managed from the very start, through the process of selecting two excellent construction planners Petra Ostanek and Tinka Prekoviè, who had the chance to create the whole project including the furnishing. The project was partly funded by the European funds. More about the building at www.ortenia.com.
Apartments Ortenia - Podèetrtek
Size: 412 m2
Floor: 2
Building period: 14 month
Year of build: 2013
Work-typ: Management and supervision
Investor: MK Projekt d.o.o.

 
 
 
 
 
Description:
We came to this construction site in May 2012, as supervisors with the task to revise the construction progress. The problem appeared in the relationship management between the contractors, investors and construction planners. The construction work has finished with phase I. in the year 2014. The project planning was done by the company Studio Galeb.
GORC Sermin - Koper
Size: 32.000 m2
Floor: 4
Building period: 4 years
Year of build: 2013
Work-typ: Supervision
Investor: Konzorcij Sermina

 
 
 
 
 
Description:
We were the supervisors in the process of the energetic adaptation. We were connecting everyone involved and rationalized the construction as a whole. At this time we also had the supervision over the II. phase in which the mechanical installations were being installed and later on we managed the project of constructing the intensive care unit in the attic.
Nursing home at the seaside - Koper
Size: 0 m2
Floor: 4
Building period: 1,2 year
Year of build: 2013
Work-typ: Supervision
Investor: Obalni dom upokojencev

 
 
 
 
 
Description:
In the village of Križe near Tržiè that lays in the Gorenjska region, investors Barbara and Boštjan have, with our help at management and supervising, created a creative workshop in the mountains.
The house has 4 floors and can be used for the organization of workshops, as well as using one of the six double bed rooms to spend the night in or alternatively using the dormitory. The building was renovated into a low energy house with great technical characteristics.
House Sojni - Tržiè
Size: Array m2
Floor: 4
Building period: 12 months
Year of build: 2013
Work-typ: Management and supervising of construction
Investor: Sojni d.o.o.

 
 
 
 
 
Description:
In the picturesque area of Phuket – Rawai beach, apartments are being built for individual buyers who wish to invest into real estate, for privet use or simply for renting to tourists. More about the project at www.duangjai.si. The structure is made out of a concrete skeleton frame filled with aerated concrete. The building has its own drinking water borehole and a reservoir for rainwater on its roof. The pool is located in the attic. In the renovation plan a new building with rooms is scheduled to be built beside the primary building as the buildings new purpose is to be turned into a hotel. A new larger pool on the roof top will be built as well, from which there is a splendid view of the Ruwai and the east coast of Phuket.
Duangjai app - Phuket Thailand
Size: 1000 m2
Floor: 5
Building period: 30 months
Year of build: 2014
Work-typ: Management and supervision
Investor: Duangjai international co.ltd

 
 
 
 
 
Description:
Dr Konekt d.o.o. is a store that sells stone that comes from Asia. The investor wanted to build a passive store on the minimum area needed, which he succeeded at. The investors wish to achieve the highest of construction standards lead to installing the facade “Qbiss” produced by the company Trimo which is a ventilated facade and so it helps with the power saving. The project was designed by the architect Sonja Oblak Burnik.
Dr konekt - PC Komenda
Size: 80 m2
Floor: 1
Building period: 4 months
Year of build: 2012
Work-typ: 
Investor: Dr konekt d.o.o.

 
 
 
 
 
Description:
We entered the project of constructing the Residence Èeligo at the finalization of the investment cycle as supervisors and continued supervising the construction of the wellness.
Residenca Èeligo - Lucija
Size: 2511 m2
Floor: 3
Building period: 20 months
Year of build: 2011
Work-typ: Supervision
Investor: Rezidenca Èeligo d.o.o.

 
 
 
 
 
Description:
Normally we do not mention owners of privet buildings, although Robert Klun is also in the position of head construction planner, together with his coworker Nadja Trampuž. The building is a passively built and inserted into classically built duplex. The architecture is very creative, with many new construction details.
House Klun
Size: 200 m2
Floor: 4
Building period: 18 months
Year of build: 2013
Work-typ: Management and supervision
Investor: Robert Klun

 
 
 
 
Description:
The architects Špela Colja and Marjan Lipièar who have opened the salon Ventovarna, as the first eko salon in Slovenia, which has a low carbon footprint and is made from human-friendly materials. Our job was to install the drywall system, so that the focus would be on environmentally friendly garden materials.

The building is located on Masarykova street in Ljubljana.
Ventovarna gypsum board instalation - Ljubljana
Size: Array m2
Floor: 1
Building period: 2 months
Year of build: 2011
Work-typ: Drywall system
Investor: Ventovarna

 
 
 
 
Description:
With the help of a liquid polyurethane based waterproofing we were able to solve the problem which occurred in the contact between the aluminum frame and concrete of the vestibule where there was a leak. Quarts sand is added to the final layer of the waterproofing. Applying the liquid waterproofing took two days to complete, because it was done in phases which lasted a couple of hours. While applying the liquid waterproofing we had to be careful and protect the other materials so that we wouldn’t stain them with the liquid waterproofing.
Doninvest Kemper Entrance
Size: 2 m2
Floor: 1
Building period: 2 days
Year of build: 2011
Work-typ: Kemper 2K-PUR detail
Investor: Doninvest d.o.o.

 
 
 
 
Description:
We prepared the offer documents for the company VG5 d.o.o., gained the business and managed segment A of the public tender, which was “replacement of windows and facade on the Elektro Slovenija office building, Hajdrihova”. The work was carried out professionally in a short time frame with excellent subcontractors and nice weather.

All the windows in the building have been replaced and old facade was replaced with the Weber facade with the thickness of 8 cm, on the area of about 5,000 m2.
ELES Hajdrihova
Size: 4.800 m2
Floor: 4
Building period: 3,5 months
Year of build: 2011
Work-typ: Management for the contractor
Investor: ELES

 
 
 
 
Description:
Private classically built house on an exceptional location above Grosuplje. The design and execution were influenced by the investor to a great degree. The problem with the retaining wall which dominates on the parcel.
The building is being constructed for a big family and has an elevator. The entrance into the building is in the attic, where the access road to the house is. The building is leaning against the hill and the residential floor is the 1st floor that is under the access road, or rather above the retaining wall. The building is classically isolated.
Private house Polica - Grosuplje
Size: 240 m2
Floor: 3
Building period: 12 months
Year of build: 2012
Work-typ: Supervision
Investor: Privat

 
 
 
 
Description:
The building is built in the old city center of Ljubljana, between “Mestni trg” and “Cankarjevo Nabrežje”, according to the instructions of the architectural biro Sadar&Vuga. The dimensions of the building, design, construction time and expenses were influenced by the guidelines of the Institute for cultural heritage, groundwater and also archaeological excavations, which was discovered priceless archaeological finds from the 9th century.
Managing the entire construction project included, supervision of the construction process, coordinating everyone involved, the search for the needed permits and approvals and managing relations with the neighbors. We also encountered a problem of compliment from all consent authorities, electricity, water and sewage, hot water and the installation of these urgent inlets and outlets to the building on the narrow “Krojaška ulica”. The building is fully utilized and designed in a modern style, which is why it was accepted into the group of “Design hotels”.
Hotel Vander - Ljubljana
Size: 1200 m2
Floor: 5
Building period: 18 month
Year of build: 2012
Work-typ: Management
Investor: Tekta d.o.o.

 
 
 
 
Description:
Do you wish to check your energy loss? Or only check water leakage, the position of conduits, even electric wiring? Here we are, to give you a certified and professionally check.

Picture 1:
Shows a building that has a heated attic and 3rd floor. The surfaces where we “loose” most of the energy are colored red.
Picture 2:
Shows a gutter hidden in the façade made out of stone wool. The gutter was leaking in the section of transition into a flat roof. With the correct preparation we found the problem in the summer.
Picture 3:
Shows the point in which the waterproofing on the terrace was leaking. The blue spot shows an incorrect adaptation which was about 3 cm under the surface of the terrace.
Picture 4 :
Shows a leaking roof. The red streaks show the way of the water flow.
Termovision checkup of buildings
Size: 200 m2
Floor: 
Building period: 
Year of build: 
Work-typ: 
Investor: vsi naroèniki

 
 
 
 
Description:
For sealing of mobile house, the investor decided to use high-elastic liquid hydro insulation mass Kemper 2K-PUR.
Sealing of mobile house
Size: 8 m2
Floor: 1
Building period: 1 day
Year of build: 2010
Work-typ: Roof sealing with Kemper 2K-PUR
Investor: privat

 
 
 
 
Description:
In the center of Maribor we performed hydro insulation using high-elastic liquid hydro insulation mass Kemperol 2K-PUR. Hydro insulation was done directly to the OSB plates, all details around releases were made with Kemper 2K-PUR hydro insulation.
Waterproofing of a terrace - Maribor Centre
Size: 95 m2
Floor: 1
Building period: 10 days
Year of build: 2009
Work-typ: Waterproofing of a terrace with Kemper 2K-PUR
Investor: privat

 
 
 
 
Description:
Before the destruction of existing water cooling plate, the technologists in Celje Cinkarna decided to carry out waterprooffing of the floor, using the Kemper 2K-PUR material. The issue of performance was in constant humidity of the building. Catch safety unit under towers is common for both towers and one tower was always functional, that's why the work was very specific.
Cinkarna Celje water proofing
Size: 145 m2
Floor: 1
Building period: 14 days
Year of build: 2010
Work-typ: Waterproofing with Kemper 2K-PUR
Investor: Cinkarna Celje

 
 
 
 
Description:
Implementation of terrace hydro insulation and all the details by the architect Mr. Stojan Èrnko at a private house near Horjul.
Private terrace Teraco P
Size: 125 m2
Floor: 1
Building period: 1 month
Year of build: 2010
Work-typ: Implementation of hydro insulation and finalising
Investor: privat

 
 
 
 
Description:
Hydro insulation of a garage roof with Kemper 2K-PUR material.
Waterproofing of house - Novo mesto
Size: 55 m2
Floor: 
Building period: 
Year of build: 2009
Work-typ: Insulation works, phase I.
Investor: Privat

 
 
 
 
 
Description:
The dental clinic in Rožna dolina, we performed all the installation works, gypsum, insulation and wood partition wall reinforcement. The interior was designed by architect Robert Klun.
Dental clinic - Viè
Size: 36 m2
Floor: 
Building period: 
Year of build: 2010
Work-typ: Assembly works
Investor: Privat

 
 
 
 
Description:
Terrace hydro insulation performance with Blondo material.
Terrace hydro insulation - Tržiè
Size: 50 m2
Floor: 
Building period: 12 hours
Year of build: 2009
Work-typ: Insulation works
Investor: privat

 
 
 
 
 
 
Description:
Waterproofing of terrace with pre-construction and waterproofing the drainage shaft with Kemper 2K-PUR hydro insulation and pre-primer coating. Due to the rapid construction method we made channels with polyurethane insulating panels PIR-M.
Waterproofing - Stranska vas pri Dobravi
Size: 145 m2
Floor: 1
Building period: 1 month
Year of build: 2009
Work-typ: Cooling towers Waterproofing using the Kemper 2K-P
Investor: Privat

 
 
 
 
Description:
Low-energy facility designed by investor, made to the stage of skeletal structure.
Passive house - Biè
Size: Array m2
Floor: 2
Building period: 3 months
Year of build: 2009
Work-typ: Implementation
Investor: Privat

 
 
 
 
Description:
For quality implementation of horizontal waterproofing of terrace above the living room, we proposed using the polyurethane coating Kemper 2K-PUR.
For a quality base, we put Styrodur insulation plates in thickness of 20 cm on the existing AB plate and then on top of that we placed concrete screeds and after drying we finalized the terrace with the Kemper coating.
Previously, we implemented insulation of the contact between the vertical and horizontal with which we avoided saturation during the construction and while waiting for screed to dry out.
Hydro insulation of terrace - Zadobrova Celje
Size: 24 m2
Floor: 1
Building period: 1 month
Year of build: 2009
Work-typ: insulation works
Investor: privat

 
 
 
 
Description:
The house is placed on concrete basement which is fortified with a stone facade and fits perfectly into the local environment. Skeletal house is made and reinforced to weather conditions in particular against the wind. The roof is flat covered with Kemperol 2K-PUR polyurethane coating.
Passive house - Ozeljan
Size: 140 m2
Floor: 1
Building period: 
Year of build: 2009
Work-typ: frame construction
Investor: Privat

 
 
 
 
Description:
Based on plans by architect Ivo Koritnik a passive house was built in the composition of the ground floor and attic. The building has a dynamic floor design, with the internal, partially flat roof and a garage with a terrace above it. Heating is done with a heat pump.
Passive house - Zbilje
Size: Array m2
Floor: 2
Building period: 5 months
Year of build: 2009
Work-typ: passive construction
Investor: Privat

 
 
 
 
Description:
A passive built building in Repinje that is facing the east, the bottom concrete part of the building is also built in the passive style. The building also has a 1st floor and an attic. The 1st floor is at the level of the surrounding terrain where most of the happening will be going on. The roof is partly double-pitched and partly flat. The attic has an entrance to the terrace. The house technology involved solving the correct way of implementing the thermal insulation and airtightness of the building.
A heat pump is used for the buildings heating and the horizontal collectors for the heat pump are placed into the ground.
Passive house - Repnje
Size: Array m2
Floor: 3
Building period: 12 months
Year of build: 2009
Work-typ: 
Investor: Privat

 
 
 
 
Description:
On the wish of the investor we expand the already built weekend house on both sides and added two new units, which are now a part of the unity. Now the whole building is built in the passive style. The construction work was done as a whole, both the application of materials and constructing the skeleton of the house.
The work done was based on the old building code compliance plans.
Passive house - Maèe pri Preddvoru
Size: Array m2
Floor: 3
Building period: 6 months
Year of build: 2009
Work-typ: Construction - prefabricated
Investor: Privat

 
 
 
 
Description:
Following the architecture of Mrs. Petra Ostanek and very well made project for execution plans, a passive house was built in a beautiful location in the center of Novo mesto. The concrete cellar is a part of the passive stricture as well, which has a 25 cm layer of thermal isolation beneath the foundation plate. The building is rectangular, simple double-pitched roof, the focus was on the extension of the purlin – roof overhang. The floor plan is dynamic, since the living room takes up the whole height of the building. The attic has an indoor balcony. Interestingly divided interior.
Passive house - Novo mesto
Size: Array m2
Floor: 3
Building period: 8 months
Year of build: 2009
Work-typ: Frame construction and instalations
Investor: privat

 
 
 
 
Description:
On the outside the building is a simple square. The inside is divided pleasantly. The building is passive, for its heating a D&W heat pump is used that uses the groundwater as its source.
Passive house - Šmartno pri Ljubljani
Size: Array m2
Floor: 2
Building period: 5 months
Year of build: 2009
Work-typ: Frame constructions and instalations
Investor: Privat

 
 
 
 
Description:
The roofing is very diverse, same as the floor plan. The investors wish was to create a very spacious house, which would reflect his recreational ambitions. The building is still in construction.
Passive house - Golo
Size: 360 m2
Floor: 3
Building period: 5 months
Year of build: 2009
Work-typ: Implementation
Investor: privat

 
 
 
 
Description:
In a very short timeframe of only 58 days, we succeeded to complete both construction and finishing works, as well as open the building on the 1st of December. The technology of work required dividing the contractors in three groups, because that was the only way to catch the deadline and solve the interplay between construction phases. All the works were managed on the construction site. The restaurant was designed by a well-known architect Mika Cimolini. With her help we successfully aligned and adjusted the possibilities of implementation, design and the investors wishes.
Thai restaurant
Size: 280 m2
Floor: 2
Building period: 2 months
Year of build: 2008
Work-typ: Management
Investor: Imperio d.o.o.

 
 
 
 
Description:
For planner and architect Mr. Robert Klun, we worked out the details of plaster ceiling and created a project of lightning. We also made a project of lightning with light assembling at the restaurant area.
TAXGROUP
Size: 120 m2
Floor: 1
Building period: 3 months
Year of build: 2008
Work-typ: Realization of ceiling and lightning
Investor: Taxgroup

 
 
 
 
Description:
This BUILDING is one of the superlatives because the project and all the details are developed on the fly with always present problem: catching the deadline.

We managed to create this building before the deadline, the excess was workmanship of absorption ceiling in "mall" dome, which spreads on about 400 m2.
CITY CENTER CELJE
Size: 35.000 m2
Floor: 2
Building period: 8 months
Year of build: 2006
Work-typ: Dry construction work
Investor: Euromarkt d.o.o.

 
 
 
 
 
Description:
"Small, but demanding" would be the words which could describe the realization of this project, as we had to make wonders to finish the works till opening day. The main point that we were able to accomplish this project together with organizing all the needed planning and technical documentation was the good preliminary coordination.

Interior is typical for all Swarowski stores.
SWAROWSKI LJUBLJANA
Size: 38 m2
Floor: 1
Building period: 45 days
Year of build: 2004
Work-typ: 
Investor: SW d.o.o.

 
 
 
 
Description:
Because we expect perfection from confectionery, the place with all its demands in technology and sanitary requirement was finished to the smallest details.

Confectionery is located on Dunajska street in atrium created as manufacture for quality candy orders.

Its a pleasure implementing a construction project which shines at the end in its primary role.
SWEETSHOP MANUFAKTURA
Size: 65 m2
Floor: 1
Building period: 6 months
Year of build: 2005
Work-typ: Whole arrangement from phase III. on.
Investor: 

 
 
 
 
Description:
In a new apartment in sixth floor with a beautiful view on surrounding, the investor decided to replace the interior of the sanitaria. Together with the investor, which is by the way also an excellent interior decorator, we remodeled the classical sanitaria into ones for which we can say that they are a building excess.
Luxurious apartment
Size: Array m2
Floor: 1
Building period: 2 months
Year of build: 2008
Work-typ: leading of interior exchange
Investor: privat

 
 
 
 
Description:
The house is made with quality in mind, with emphasize on investors active cooperation during construction. The house is esthetically and functional well placed in rural surroundings. Heating is realized with heat pump system and recuperator combined with quality windows supplied by Internorm.

Isolation trendisol was blown into circumferential walls in thickness of 18 + 12 cm, which places the house among passive ones.
Passive house - Moste pri Komendi
Size: 165 m2
Floor: 2
Building period: 3 months
Year of build: 2007
Work-typ: Management
Investor: privat

 
 
 
 
Description:
Architect Klun Robert had a difficult task of placing a low energy building into the slope and maintain good lightness and correct positioning regarding the correct orientation towards the sun, but he made it together with his team. With its irregular window form, the building will always be architectural interesting.

The building is placed among low energy buildings but not among 3-5L,
because of the investors desires for wooden windows. Isolation trendisol is blown into circumferential walls in thickness of 18 cm and 25 cm inside the roof, which is flat and covered with Sika foil.

The façade was made out of natural wooden plates which were thermally treated. This gives the façade a log lasting look.

At the borders and to variegate the façade the architect added Max interior plates.

The whole project was carried out in a year.



Passive hause Sora - Medvode
Size: Array m2
Floor: 2
Building period: 3 months
Year of build: 2007
Work-typ: Management
Investor: Privat

 
 
 
 
Description:
We built and low energy building which was projected by architect Janez Lajovic. The building is very simple, square shaped, with 30 cm trendisol isolation in all walls and in roof, which places the building among passive ones.
Passive house - Ajdovšèina
Size: 140 m2
Floor: 2
Building period: 3 months
Year of build: 2007
Work-typ: Management
Investor: Privat

 
 
 
 
Description:
In a beautiful alpine village of Bohinjska Bela, the investor decided to replace the "floor" with two apartments for rent, in two floors with our low energy 3L house.
Passive house - Bohinjska bela
Size: 185 m2
Floor: 2
Building period: 3 months
Year of build: 2008
Work-typ: leading
Investor: privat

 
 
 
 
Description:
We successfully finished two dry assembling and painting works with special care of carrying out all works during non operational hours of 'Probanka' bank.
PROBANKA MARIBOR
Size: 400 m2
Floor: 4
Building period: 1 month
Year of build: 2006
Work-typ: Plaster and painting works
Investor: Probanka Maribor

 
 
 
 
Description:
Arrangement of the entrance jutting roof at the business department of Austrian embassy. We had to replace the existent ceiling wainscot with Max exterior ceiling plate in the same color together with renewal of the metal roof construction. We also had to replace the wooden floor plates with granitic plates and security entrance door with the same appearance.
UNIVIT - Austrian Ambassy
Size: 20 m2
Floor: 1
Building period: 3 months
Year of build: 2008
Work-typ: Idea and realization of jutting roof
Investor: Univit d.d.

 
 
 
 
Description:
On public official invitation for tenders we acquired a project which consisted of replacing the existent cooper roof shingles with Sika foil and replacing the heat isolation and sheet metal wainscot.

At Elektro Slovenija company we are placed in A1 class of constructors.
ELES - zamenjava kritine
Size: 1245 m2 m2
Floor: 1
Building period: 3 months
Year of build: 2007
Work-typ: Sanitation of roof with Siko shingle
Investor: Elektro Slovenija d.o.o.

 
 
 
 
Description:
Sanitation of terrace with realization of a low energy construction and glazed windows into a home relaxation centre, which includes setting up a Jacuzzi tub and the whole living room with audio/video equipment, accommodated to investor.
PRIVAT SPA CENTER Grosuplje
Size: 60 m2 m2
Floor: 1
Building period: 3 months
Year of build: 2007
Work-typ: An iIdea with realization
Investor: privat

 
 
 
 
Description:
Passive house by arhitekt Mr. Domen and Mrs. Mateja Gerkssich.
Passive house - Škrjanèevo
Size: Array m2
Floor: 2
Building period: 3 months
Year of build: 2008
Work-typ: construction
Investor: privat

 
 
 
 
Description:
Construction a multipurpose low energy building.
ANDERSEN - DUNAJSKA
Size: 2.400 m2 m2
Floor: 4
Building period: 12 months
Year of build: 2008
Work-typ: building management
Investor: Andersen d.o.o.

 
 
 
 
Description:
Jeweler’s shop: complete construction of the saloon - from canalization, ventilation, electricity, floor, walls, to various details like inscription, colors, position of lightning, ...

http://www.dezeen.com/2008/03/24/lara-bohinc-jewellery-store-by-elastik/

http://www.framemag.com/
JEWELLERY STORE LARA BOHINC LONDON
Size: Array m2
Floor: 2
Building period: 20 days
Year of build: 2008
Work-typ: total adaptation
Investor: Lara Bohinc International Ltd

 
 
 
 
 
 
 
 
Description:
We are carrying out all adaptation and maintenance works for Univit company on Nazarjevi 6, currently there is a local Tramontana in the cellar. We have adapted and freshened up almost the whole building from 1996 to 2006. We would mostly like to emphasize the arrangement of the premises for Peugeot company on the second floor and execution of a quality lowenergetic, vapour permeable roofwhole with trendisol thermic isolation and agepan plates.
UNIVIT
Size: Array m2
Floor: 4 nadstropja
Building period: 1996-2006
Year of build: 1996-2006
Work-typ: maintenance works
Investor: UNIVIT D.D.

 
 
 
 
 
 
 
 
Description:
Everlasting fight with time continues as we had to plan on site together with construction and all that in only 20 working days till new reopening.

Shop is located in ground floor of Citypark shopping centre in BTC Ljubljana.
DOUGLAS CITYPARK
Size: 110 m2
Floor: 1
Building period: 20 days
Year of build: 2005
Work-typ: Adaptation
Investor: Douglas d.o.o.

 
 
 
 
Description:
Shopping mall City park is located in the eastern part of the BTC shopping area in Ljubljana. The enlargement of the Interspar shop began in 2001 and shopping centre City Park was built in three phases. Our company was in charge of all major dry wall works directly for rhe investorEuromarkt d.o.o. Phase III was completed in 2005. And other phases are to follow... 
CITY PARK LJUBLJANA
Size: Array m2
Floor: 2
Building period: 12 months
Year of build: 2001
Work-typ: suhomontažna dela
Investor: Euromarkt d.o.o.

 
 
 
 
 
 
Description:
Hotel Maestral, owned by HIT d.o.o. company, in Pržno by Budva, was our first work in Montenegro. Our company stepped in to finish dry ceilings and walls in the gambling area. The work was very specific due to the specific delivery of the material and Montenegrin temperament...
HIT CASINO MONTENEGRO
Size: 1200 m2
Floor: 2
Building period: 2 months
Year of build: 2004
Work-typ: dry wall works
Investor: Atena za Lesnino d.d.

 
 
 
 
 
Description:
The facility is on the ground floor of the City Park shopping centre. Dry wall works included the delivery and assembling of the splinter plates on galvanized underconstruction, and the construction had to be thickened. Paintworks were demanding, because the color shades and quality construction of the corners are changing from one shopping space to another. altough we were pressed for time, this did not show in the quality of the works.
H&M Ljubljana
Size: Array m2
Floor: pritlièje
Building period: 3 months
Year of build: 2005
Work-typ: Dry wall works and paintworks
Investor: H&M Slovenija

 
 
 
 
Description:
The Chinese restaurant was built at the spot where Nordsee inn used to stand. Company Bitermo was in charge of adaptation and modification. We carried out the iron supporting construction, we set up all the chinese conclusions and all the drywall works and paintworks.  
CHINESE RESTAURANT
Size: Array m2
Floor: 1
Building period: 4 months
Year of build: 2005
Work-typ: Drywall and locksmith½ works
Investor: 

 
 
 
 
 
 
 
 
Description:
Domino hotel is located along the Dunajska cesta next to the Northern
circular bypass in Ljubljana. The hotel has 9 floors and three cellar levels.
There is a Wellness center and a conference center in the second cellar,
Casino Ljubljana in the first cellar and a reception room on the ground floor.
The first floor is a restaurant section. Rooms on each floor are divided by
plaster partition walls, a ceiling and a lining. All partition walls and shafts are
made in accordance with sound and fire requirements.
Austria Trend Hotel Ljubljana
Size: 24.000 m2 m2
Floor: 9
Building period: 9 months
Year of build: 2003
Work-typ: dry wall install
Investor: USB HOTEL

 
 
 
 
 
 
 
 
Description:
The facility is located on the ground floor of Citypark shopping mall. The distinction of these construction works are adjustments of the works and short amont of time between the idea and time of the sale. Namely, the facility was renewed in 30 working days. The manager of the facility was Darko Bauman.
HARTLAUER LJUBLJANA
Size: 120 m2
Floor: 1
Building period: 20 days
Year of build: 2004
Work-typ: Drywall works and paint works
Investor: Hartlauer Slovenija

 
 
 
 
 
 
 
 
Description:
The construction of the ventilated ceramic facade was in our hands. The facade ceramic plates (dim 60x60 cm) are fixed to the aluminium underconstruction, which was, according to the static plan, partly fixed partly flexibly adjusted to the facade wall. Because of the partial adaptaion of the building (former cinema hall) on the Cherepovecki street, the fundamental walls were not vertical, the work was very demanding and during the construction works the temperature was as low as -10 and down to -20 degrees. The construction works were completed in record time of 46 days.
ZBEREGATELJNI BANK MOSKVA
Size: 6.850 m2
Floor: 4
Building period: 4 months
Year of build: 1995
Work-typ: Construction of the ceramic facade
Investor: Slon interier za SCT d.d. Ljubljana

 
 
 
 
Description:
The building is located ic Citycenter Celje, on the ground floor, opposite the entrance to the Interspar shop. Because of the specific sale of the crystal products this shop requires a high level of lighting. Because of the manner of construction of the entire shopping mall the construction of the Swarovski shop was a peculiar challenge, where proper adjustment among the performers of individual works and timing of the works were decisive.
SWAROVSKI SHOP CELJE
Size: 32 m2
Floor: 1
Building period: 1 month
Year of build: 2006
Work-typ: Complete construction with projects
Investor: SW d.o.o.

 
 
 
 
Description:
Imperio Mexicano Celje facility was entirely conducted and carried out from the third construction phase by the Elitbau d.o.o. company. The manager of the building was Jolanda Kalan. The outline leader of the interior was Matej Lampiè - Lampa. Because of the swift construction of the entire centre the complete organization of the construction was subjected to the time plan of the centre opening. Subcontractors, electricians, plumbers, fitters, welders, technical kitchen equipment and final interiorists successfully collaborated on this project under the lead of Elitbau company.
IMPERIO MEXICANO CELJE
Size: 255 m2
Floor: 2
Building period: 45 working days
Year of build: 2005
Work-typ: all interier
Investor: IMPERIO D.O.O.

 
 
Untitled Document
Untitled Document
  Rawai-Phuket-Thailand
  Vander - New York Times
  Ortenia - The opening
  
  Kemper-system
  
  Nadzor gradnje
  
  Lara Bohinc - London
Untitled Document
  Consultants International
  Marta Studio
  Kemper system
  Armstrong stropovi
  Mehiska restavracija
  Velux okna
  Trgovina Kalcer
  Eko materiali